INSP - Sprinkler & Backflow | 4/21/1997 | 4/22/1997 | 4/23/1997 | A | FAIL |
Gary Ziegler
|
|
|
04/22/97 334 - IS THIS ONE DONE. YOU HAD 8/18/ IN THE DATE. SO DON'T KNO /PE
|
INSP - Sprinkler & Backflow | 4/18/1997 | 4/18/1997 | 4/18/1997 | | FAIL |
|
|
|
raise pvb 12 ins above highest head , needs cert
|
INSP - Sprinkler & Backflow | 4/15/1997 | 4/16/1997 | 4/17/1997 | A | FAIL |
Gary Ziegler
|
|
|
water line still not finaled just a partial he states it was finaled backflow preventer needs raised or dcva installed , needs cert gz
|
INSP - Water lines | 1/21/1997 | 1/22/1997 | 1/23/1997 | A | PART |
Gary Ziegler
|
|
|
01/22/97 334 - READY AT 11:00
|