INSP - Final | 4/25/1997 | 4/25/1997 | 4/25/1997 | P | PASS |
Stan Johnson
|
|
|
04/25/97 352 - REINSPECTION
|
INSP - Final | 4/18/1997 | 4/18/1997 | 4/18/1997 | P | FAIL |
Stan Johnson
|
|
|
04/18/97 352 - tub spout needs to be stubed out in copper not cpvc second tub to be tiled by home owner
|
INSP - Plumbing Rough-in | 3/17/1997 | 3/17/1997 | 3/17/1997 | P | PASS |
Stan Johnson
|
|
|
03/17/97 352 -
|