PLM - Partial final | 6/12/1997 | 6/13/1997 | 6/16/1997 | A | PART |
Gary Ziegler
|
|
|
06/13/97 334 - Temp. Occupancy
|
INSP - Conference | 4/14/1997 | 4/14/1997 | 4/14/1997 | | PASS |
Gary Ziegler
|
|
|
/ / 334 - talked with Bill , about water sizing of main water service
|
INSP - Sewer line | 4/11/1997 | 4/14/1997 | 4/14/1997 | A | PASS |
Gary Ziegler
|
|
|
04/14/97 334 - AND INTERCEPTOR
|
INSP - Conference | 4/2/1997 | 4/2/1997 | 4/2/1997 | | PASS |
Gary Ziegler
|
|
|
/ / 334 - had 2 conversation's with mr goff,with the school disrict , instructing him to have his design people to give written calculations o water sizing on project , the other to permit and excavate waterline, an these correction's will not effec
|
INSP - Plumbing Rough-in | 3/31/1997 | 4/1/1997 | 4/1/1997 | A | PART |
Gary Ziegler
|
|
|
04/01/97 334 - made out 2 more notices permit main waterline out side , calculations on water sizing for project partial ri ok gz east section of building
|
INSP - Plumbing Rough-in | 3/31/1997 | 3/31/1997 | 3/31/1997 | P | FAIL |
Gary Ziegler
|
|
|
|