INSP - Final | 7/13/1998 | 7/14/1998 | 7/14/1998 | A | PASS |
Jim Soden
|
|
|
07/13/98 347 - permocc. o/k 347 7/14/8
|
INSP - Final | 6/29/1998 | 6/30/1998 | 6/30/1998 | P | PART |
Jim Soden
|
|
|
06/29/98 347 - review with lee 347
|
INSP - Final | 6/23/1998 | 6/23/1998 | 6/23/1998 | P | PART |
Jim Soden
|
|
|
TEMP OCC GYM ONLY 347 6/23/8
|
INSP - Plumbing Rough-in | 5/14/1998 | 5/13/1998 | 5/14/1998 | | |
Jim Soden
|
|
|
|
INSP - Plumbing Rough-in | 5/14/1998 | 5/13/1998 | 5/13/1998 | A | PART |
Jim Soden
|
|
|
conference on thermal expansion tanks
|
INSP - Plumbing Rough-in | 4/23/1998 | 4/24/1998 | 4/26/1998 | P | PART |
Jim Soden
|
|
|
04/24/98 347 - r/i rms 237, 238, 239, 241 o/k 347 4/24/8
|
INSP - Plumbing Rough-in | 4/22/1998 | 4/23/1998 | 4/23/1998 | P | FAIL |
Jim Soden
|
|
|
04/23/98 347 - northside 2nd floor classroom pipeing U>P>C 318 multiple fail 347 4/22/8
|
INSP - Plumbing Rough-in | 3/25/1998 | 3/26/1998 | 3/26/1998 | P | PART |
Jim Soden
|
|
|
03/26/98 347 - north overhang rain leaders o/k 347 3/26/8
|
INSP - Plumbing Rough-in | 2/27/1998 | 2/27/1998 | 2/27/1998 | P | PART |
Jim Soden
|
|
|
02/27/98 347 - rooms 222 225 acid pipe o/k rain leader 233 west o/k 347
|
INSP - Plumbing Rough-in | 2/23/1998 | 2/24/1998 | 2/25/1998 | P | PART |
Jim Soden
|
|
|
02/24/98 347 - rain leaders o/k over rms # 234' 237' 238' 241 7 STAIRWEL 347 2/24/8
|
INSP - Plumbing Rough-in | 2/9/1998 | 2/10/1998 | 2/10/1998 | P | PART |
Jim Soden
|
|
|
02/10/98 347 - all rain drains on north 1/2 of building complete 347 2/1
|
INSP - Plumbing Rough-in | 2/4/1998 | 2/5/1998 | 2/5/1998 | P | PART |
Jim Soden
|
|
|
02/05/98 347 - RAIN DRAIN RM 210-220 THRU ROOF. 8" MECH RM TO 109 THRU F RM'S 220, 227, 237,238 O/K 347 2/5/8
|
INSP - Plumbing Rough-in | 2/3/1998 | 2/3/1998 | 2/4/1998 | P | PART |
Jim Soden
|
|
|
02/03/98 347 - ACID RM 222, 238, 239, 225, 241, 221 IS. SINK. DWV RM 24 DRAIN RM 142, 239. ALL THRU 2ND FLOOR ONLY 347 2/3/8
|
INSP - Plumbing Rough-in | 2/2/1998 | 2/2/1998 | 2/2/1998 | P | PART |
Jim Soden
|
|
|
02/02/98 347 - first floor section A rain drain, dwv, acid pipe 347 2/0
|
INSP - Plumbing Rough-in | 1/5/1998 | 1/6/1998 | 1/6/1998 | P | PASS |
Jim Soden
|
|
|
01/06/98 347 - restroom on the second floor section 'b' 347 1/6/8
|
INSP - Plumbing Rough-in | 11/3/1997 | 11/3/1997 | 11/3/1997 | P | PART |
Jim Soden
|
|
|
11/03/97 347 - RAIN LEADER AND OVERFLOW DRAIN on the horizontal and downward vertical in gym. roofpenetrations not done 347
|
INSP - Water lines | 10/27/1997 | 10/27/1997 | 10/27/1997 | P | PART |
Jim Soden
|
|
|
10/27/97 347 - SECTION B--2ND FLOOR water risers 347
|
INSP - Plumbing Rough-in | 10/16/1997 | 10/16/1997 | 10/16/1997 | P | PASS |
Jim Soden
|
|
|
10/16/97 347 - SECTION B boys restroom lav bank 347
|
INSP - Plumbing Rough-in | 10/9/1997 | 10/10/1997 | 10/10/1997 | P | PART |
Jim Soden
|
|
|
10/10/97 347 - ROOM 131 -HUMAN DEV. ROOM W&V S.E. FAULTY BATH WASTE
|
INSP - Water lines | 10/6/1997 | 10/6/1997 | 10/6/1997 | P | PART |
Jim Soden
|
|
|
10/06/97 347 - rough in on water line RISERS-ROOM 131 KITCHEN- DISCUSSED VENTING DIFFICULTY WITH GLASS PIPE, I WILL TALK TO LEE WITH IDEA FOR SOLUTION 347
|
INSP - Plumbing Rough-in | 9/24/1997 | 9/25/1997 | 9/25/1997 | P | PART |
Jim Soden
|
|
|
09/25/97 347 - ROOMS 126 AND 130 RESTROOMS SEC. B 2 OF FIVE CAFE SINKS NUMEROUS FREESTANDING STACKS AND RISERS (TAGGED O/K) 347 20 MIN.
|
INSP - Plumbing Rough-in | 9/16/1997 | 9/17/1997 | 9/17/1997 | A | PART |
Jim Soden
|
|
|
09/16/97 347 - SECTION H6 DRAIN,VENT, WATER O/K 3 JAN SINKS SECTION B 347 20 MIN.
|
INSP - Water lines | 9/15/1997 | 9/15/1997 | 9/15/1997 | P | PASS |
Jim Soden
|
|
|
09/15/97 347 - TOP OUT SECTION B BOYS RESTROOM 347 20 MIN.
|
INSP - Ground work | 9/11/1997 | 9/11/1997 | 9/11/1997 | P | PART |
Jim Soden
|
|
|
09/11/97 347 - in kitchen area, F6, D.5X6, EX4 347 25 MIN.
|
INSP - Plumbing Rough-in | 9/8/1997 | 9/9/1997 | 9/9/1997 | A | PART |
Jim Soden
|
|
|
09/09/97 347 - top out for section b rm 125, d/f & waste riser s/e cor. acid riser & d/f g/w s/e corner 2 bathrooms & 2 sinks g/w se corner 347 30 min.
|
INSP - Plumbing Rough-in | 9/8/1997 | 9/8/1997 | 9/8/1997 | P | FAIL |
Jim Soden
|
|
|
09/08/97 347 - top out on sec. b WASTE TEST FAILED 347 30 MIN.
|
INSP - Ground work | 9/3/1997 | 9/4/1997 | 9/5/1997 | A | PART |
Jim Soden
|
|
|
09/04/97 347 - G/W SECTION A-MECH. ROOM 347 30.MIN
|
INSP - Ground work | 8/25/1997 | 8/26/1997 | 8/26/1997 | P | PART |
Jim Soden
|
|
|
08/26/97 347 - acid waste a and b sec. c-5 thru k-5 347 30 min.
|
INSP - Ground work | 7/2/1997 | 7/3/1997 | 7/3/1997 | A | PART |
Jim Soden
|
|
|
07/02/97 347 - storm drains 1f thru 6f and 6f thru 6d F LINE 1THRU 6 F6 TO D6
|
INSP - Ground work | 7/2/1997 | 7/2/1997 | 7/2/1997 | P | PART |
Jim Soden
|
|
|
07/02/97 347 - kitchen sanitary 1 to 5 by d5 whatever that means kit grease line to intercepter 347
|
INSP - Ground work | 7/1/1997 | 7/1/1997 | 7/1/1997 | P | PART |
Jim Soden
|
|
|
07/01/97 347 - ground work on the grease interceptor for kit drain less vent to be installed later 347
|
INSP - Ground work | 6/30/1997 | 6/30/1997 | 6/30/1997 | P | PART |
Jim Soden
|
|
|
06/30/97 347 - section B west end storm drain o/k 347
|
INSP - Conference | 6/29/1997 | 6/29/1997 | 6/29/1997 | | PASS |
Jim Soden
|
|
|
/ / 347 - discussed grease interceptor
|
INSP - Plumbing Rough-in | 6/27/1997 | 6/27/1997 | 6/27/1997 | P | PART |
Jim Soden
|
|
|
06/27/97 347 - Sanitary restroom section B lines 2,3,4,6 ground work drainage
|
INSP - Ground work | 6/26/1997 | 6/26/1997 | 6/26/1997 | P | FAIL |
Jim Soden
|
|
|
06/26/97 347 - grease trap in section A requires vent and clean out on discharge---seal riser rings test 347
|
INSP - Ground work | 6/25/1997 | 6/25/1997 | 6/25/1997 | P | PART |
Jim Soden
|
|
|
06/25/97 347 - storm drain section B lines 1 thru 5 underground
|
INSP - Ground work | 6/23/1997 | 6/24/1997 | 6/24/1997 | A | PART |
Jim Soden
|
|
|
06/24/97 347 - sewer/water
|
INSP - Plumbing Rough-in | 6/24/1997 | 6/24/1997 | 6/24/1997 | P | CANC |
Jim Soden
|
|
|
06/24/97 347 - gas test gave to dave
|