INSP - Sewer line FINAL | 10/22/1997 | 10/22/1997 | 10/22/1997 | A | PASS |
Stan Johnson
|
|
|
balance of tests on repaired laterals air and manderal tests complete
|
INSP - Sewer line | 10/21/1997 | 10/21/1997 | 10/21/1997 | A | NR |
Stan Johnson
|
|
|
10/21/97 352 - mandrel and finish airtests
|
INSP - Sewer line | 10/22/1997 | 10/21/1997 | 10/21/1997 | P | PART |
Lee Rice
|
|
|
ALL 8' SEWERS MANDRELLED OK, EXCEPT 5 TO 5A MANHOLES.
|
INSP - Sewer line | 10/17/1997 | 10/20/1997 | 10/20/1997 | A | PART |
Stan Johnson
|
|
|
AT NINE UNLESS THEY CALL SEWER LINE TESTS sewer lines ok except #5 to 5a 8" leaks and 2b both 6" leak
|
INSP - Sewer line | 8/12/1997 | 8/12/1997 | 8/12/1997 | A | PART |
Stan Johnson
|
|
|
sewer line check gravel fill contractor will air test and manderal test when complete
|
INSP - Sewer line | 8/8/1997 | 8/8/1997 | 8/8/1997 | P | NR |
Stan Johnson
|
|
|
08/08/97 352 -
|