INSP - Final | 1/22/1998 | 1/22/1998 | 1/22/1998 | | PASS |
Jim Soden
|
|
|
/ / 347 - w/c2 b4 t2 sh1 s1 w/b1 w/h1 w/s1 347 1/22/8
|
INSP - Final | 1/21/1998 | 1/22/1998 | 1/22/1998 | A | NH |
Jim Soden
|
|
|
01/21/98 347 - ###-#### not open 347 1/22/8
|
INSP - Plumbing Rough-in | 11/10/1997 | 11/10/1997 | 11/10/1997 | P | PASS |
Jim Soden
|
|
|
11/10/97 347 - reinspection 347
|
INSP - Plumbing Rough-in | 11/7/1997 | 11/7/1997 | 11/7/1997 | P | FAIL |
Gary Ziegler
|
|
|
11/07/97 334 - no waste test , need cleanout on loop vent
|
INSP - Plumbing Rough-in | 11/3/1997 | 11/3/1997 | 11/3/1997 | P | FAIL |
Jim Soden
|
|
|
11/03/97 347 - Scheduled by Hello! on 11/03/97 at 08:40:40. waste test failed, needs c.o. on foot vent 347
|
INSP - Ground work | 9/12/1997 | 9/12/1997 | 9/12/1997 | P | PASS |
Jim Soden
|
|
|
09/12/97 347 - Scheduled by Hello! on 09/12/97 at 09:12:12. ready after 3 347 20 MIN.
|