INSP - Final | 12/18/1997 | 12/18/1997 | 12/18/1997 | P | PASS |
Stan Johnson
|
|
|
12/18/97 352 - rein
|
INSP - Final | 12/17/1997 | 12/17/1997 | 12/17/1997 | P | FAIL |
Stan Johnson
|
|
|
12/17/97 352 - COMBO TO LOCK BOX IS MCI caulk shower trim 6"clerance required on T&P VALVE
|
INSP - Plumbing Rough-in | 10/30/1997 | 10/31/1997 | 10/31/1997 | A | PASS |
Stan Johnson
|
|
|
10/31/97 352 - REINSPECTION
|
INSP - Plumbing Rough-in | 10/30/1997 | 10/30/1997 | 10/30/1997 | P | NR |
Stan Johnson
|
|
|
10/30/97 352 -
|