INSP - Final | 1/8/1998 | 1/8/1998 | 1/8/1998 | | PASS |
Gary Ziegler
|
|
|
/ / 334 -
|
INSP - Final | 1/7/1998 | 1/8/1998 | 1/8/1998 | A | PART |
Gary Ziegler
|
|
|
01/08/98 334 - NEEDS THERMAL EXSPANSION TANK
|
INSP - Final | 12/31/1997 | 1/2/1998 | 1/2/1998 | A | PART |
Bill VanDegrift
|
|
|
01/02/98 330 - turn on hot water, pipe vacuum pump discharge to hub drai rp discharge to drain, complete piping relocation in dentist office, tem ok.
|
INSP - Final | 12/29/1997 | 1/2/1997 | 12/31/1997 | P | CANC |
Jim Soden
|
|
|
sent in wrong year 1997 will change to 1998
|
INSP - Conference | 11/4/1997 | 11/4/1997 | 11/4/1997 | | PASS |
Gary Ziegler
|
|
|
/ / 334 -
|
INSP - Plumbing Rough-in | 11/4/1997 | 11/4/1997 | 11/4/1997 | P | PASS |
Gary Ziegler
|
|
|
11/04/97 334 - maylan ###-####-13193
|