INSP - Final | 12/7/1998 | 12/7/1998 | 12/7/1998 | A | PASS |
Bill VanDegrift
|
|
|
|
INSP - Final | 5/28/1998 | 5/28/1998 | 5/28/1998 | P | PART |
Bill VanDegrift
|
|
|
05/28/98 330 - test dcva temp occ ok
|
INSP - Plumbing Rough-in | 4/7/1998 | 4/7/1998 | 4/7/1998 | P | PART |
Bill VanDegrift
|
|
|
04/07/98 330 - ken ###-#### rough in shop ri ok
|
INSP - Plumbing Rough-in | 2/17/1998 | 2/17/1998 | 2/17/1998 | P | PART |
Bill VanDegrift
|
|
|
###-#### ken rough restrooms in office area ok to cover, no drain permitted in storage area
|
INSP - Plumbing Rough-in | 1/7/1998 | 1/7/1998 | 1/7/1998 | P | PASS |
Bill VanDegrift
|
|
|
01/07/98 330 - groundwork g/w complete
|
INSP - Ground work | 12/31/1997 | 12/31/1997 | 12/31/1997 | | NR |
Bill VanDegrift
|
|
|
/ / 330 -
|
INSP - Ground work | 12/31/1997 | 12/31/1997 | 12/31/1997 | | PART |
Bill VanDegrift
|
|
|
/ / 330 - partial g/w ok north shop
|
INSP - Plumbing Rough-in | 12/30/1997 | 12/31/1997 | 12/31/1997 | A | NR |
Bill VanDegrift
|
|
|
12/31/97 330 - this was an g/w inspection
|
INSP - Ground work | 12/10/1997 | 12/10/1997 | 12/10/1997 | P | PART |
Gary Ziegler
|
|
|
12/10/97 334 - BOISE URBAN STAGES wrote correction sec 321 and instructed them to turn 90s down into catch basins. gz
|
INSP - Ground work | 12/2/1997 | 12/2/1997 | 12/2/1997 | | PASS |
Gary Ziegler
|
|
|
/ / 334 -
|
INSP - Plumbing Rough-in | 12/2/1997 | 12/2/1997 | 12/2/1997 | P | CANC |
Gary Ziegler
|
|
|
12/02/97 334 -
|
INSP - Water lines | 11/24/1997 | 11/25/1997 | 11/25/1997 | A | PART |
Bill VanDegrift
|
|
|
11/25/97 330 - BOISE URBAN STAGES water line from service to slab penatration
|