INSP - Final | 3/11/1998 | 3/9/1998 | 3/9/1998 | A | PASS |
Gary Ziegler
|
|
|
|
INSP - Final | 3/9/1998 | 3/9/1998 | 3/9/1998 | P | PART |
Gary Ziegler
|
|
|
partial only alll equipment needs to be set for final gz 03/09/98 334 - Scheduled by Hello!. Contact phone is [4663707].
|
INSP - Final | 3/6/1998 | 3/6/1998 | 3/6/1998 | P | FAIL |
Stan Johnson
|
|
|
03/06/98 352 - Scheduled by Hello!. Contact phone is [4663707]. backflow not listed for vertical
|
INSP - Final | 3/4/1998 | 3/5/1998 | 3/6/1998 | A | FAIL |
Stan Johnson
|
|
|
03/05/98 352 - Scheduled by Hello!. Contact phone is [4663707]. backflow and thermal expansion required
|
INSP - Plumbing Rough-in | 2/4/1998 | 2/5/1998 | 2/5/1998 | A | NR |
Stan Johnson
|
|
|
02/05/98 352 - MAPLE TREE PLAZA--INA AT ###-####
|
INSP - Plumbing Rough-in | 2/5/1998 | 2/5/1998 | 2/5/1998 | P | PASS |
Stan Johnson
|
|
|
ima ###-#### reinspection on rough in doing work in other tenant space not permited j sly tagged to obtain permit
|