INSP - Final | 3/19/1998 | 3/19/1998 | 3/19/1998 | P | PASS |
Jim Soden
|
|
|
03/19/98 347 - W/C2 B3 T2 SI1 W/B1 W/H1 FINAL O/K 347 3/19 /8
|
INSP - Plumbing Rough-in | 2/10/1998 | 2/11/1998 | 2/11/1998 | A | FAIL |
Jim Soden
|
|
|
02/10/98 347 - waste test failed 347 2/22/8
|
INSP - Plumbing Rough-in | 2/11/1998 | 2/11/1998 | 2/11/1998 | P | PASS |
Jim Soden
|
|
|
02/11/98 347 - reinspection roughin o/k 347 2/11/8
|