INSP - Plumbing Rough-in | 2/19/1998 | 2/19/1998 | 2/19/1998 | P | PASS |
Gary Ziegler
|
|
|
02/19/98 334 - STEVE ###-####
|
INSP - Plumbing Rough-in | 2/18/1998 | 2/18/1998 | 2/18/1998 | P | FAIL |
Bill VanDegrift
|
|
|
02/18/98 330 - ###-#### SPENCE PLUMBING REIN pex within 12" of recessed lighting, access to tub and shower stops requ
|
INSP - Plumbing Rough-in | 2/12/1998 | 2/12/1998 | 2/12/1998 | P | FAIL |
Gary Ziegler
|
|
|
02/12/98 334 - ###-#### secure tub and shower valves, align shower , and tub and shower valve to be able to acess intergal stops gz
|