INSP - Final | 3/23/1998 | 3/24/1998 | 3/24/1998 | A | PASS |
Stan Johnson
|
|
|
03/24/98 352 - COMBO IS BBI--ERROL ###-####
|
INSP - Plumbing Rough-in | 2/24/1998 | 2/24/1998 | 2/24/1998 | P | PASS |
Stan Johnson
|
|
|
02/24/98 352 - ###-#### REINSPECTION ON RI
|
INSP - Plumbing Rough-in | 2/23/1998 | 2/23/1998 | 2/23/1998 | P | FAIL |
Gary Ziegler
|
|
|
02/23/98 334 - ###-#### errol waste test failed
|
INSP - Plumbing Rough-in | 2/13/1998 | 2/13/1998 | 2/13/1998 | P | PASS |
Stan Johnson
|
|
|
02/13/98 352 - ERROL ###-#### S/W
|