INSP - Final | 6/29/1998 | 6/30/1998 | 7/1/1998 | P | PART |
Jim Soden
|
|
|
06/29/98 347 - review with lee 347
|
INSP - Final | 5/18/1998 | 5/18/1998 | 5/18/1998 | A | FAIL |
Jim Soden
|
|
|
will not sign off finocc. until new fixtures on plan have been installed and every thing related is ready for final 347 5/18/8
|
INSP - Final | 5/14/1998 | 5/15/1998 | 5/15/1998 | A | FAIL |
Jim Soden
|
|
|
05/15/98 347 - not ready again 347 5/15/8one is [3627814].
|
INSP - Plumbing Rough-in | 5/15/1998 | 5/15/1998 | 5/15/1998 | P | PASS |
Jim Soden
|
|
|
05/15/98 347 - finocc. o/k 347 5/15/8
|
INSP - Final | 5/14/1998 | 5/14/1998 | 5/14/1998 | P | PART |
Jim Soden
|
|
|
05/14/98 347 - part.fin. temp occ. o/k kit. & bar equipment temp. full f after exchange 347 5/14/8
|
INSP - Plumbing Rough-in | 5/1/1998 | 5/1/1998 | 5/1/1998 | P | PART |
Jim Soden
|
|
|
05/01/98 347 - partial r/i waste and water annex and adjoinging utility 347 5/1/8
|
INSP - Plumbing Rough-in | 4/14/1998 | 4/15/1998 | 4/15/1998 | A | PART |
Jim Soden
|
|
|
04/14/98 347 - lower bar waste and water o/k to cover 347 4/15/8
|
INSP - Plumbing Rough-in | 4/7/1998 | 4/7/1998 | 4/7/1998 | P | PART |
Jim Soden
|
|
|
04/07/98 347 - 1st and 2nd floor bars waste and vents only 347 4/7/8
|
INSP - Plumbing Rough-in | 4/3/1998 | 4/3/1998 | 4/3/1998 | P | FAIL |
Bill VanDegrift
|
|
|
04/03/98 330 - Scheduled by Hello!. Contact phone is [3627814]. TALKED TO RON, HE'S GOING TO ADD A VENT ON THE TWO SOUTH FLOOR SINKS AND THE TRAP ARN TO THE WESTERN SINK ON THE 2ND FLOOR TO COMPLY WITH COMBO W AND VENT SYSTEM REQUIREMENTS.
|
INSP - Plumbing Rough-in | 3/12/1998 | 3/12/1998 | 3/13/1998 | P | PART |
Jim Soden
|
|
|
03/12/98 347 - g/w in new addition o/k 347 3/12/8
|