INSP - Final | 7/9/1998 | 7/9/1998 | 7/9/1998 | A | PART |
Jim Soden
|
|
|
phone conference 347 7/9/8
|
INSP - Final | 7/9/1998 | 7/9/1998 | 7/9/1998 | A | PART |
Jim Soden
|
|
|
phone conference 347 7/9/8
|
INSP - Final | 7/8/1998 | 7/9/1998 | 7/9/1998 | A | PASS |
Jim Soden
|
|
|
07/08/98 347 - re-inspection w/c1 tub1 si6 347 7/9/8 final o/k
|
INSP - Final | 7/8/1998 | 7/8/1998 | 7/8/1998 | A | PART |
Jim Soden
|
|
|
reviewed upstairs work but contractor forgot key to basement do tomorrow 347 7/8/8
|
INSP - Plumbing Rough-in | 7/6/1998 | 7/7/1998 | 7/7/1998 | A | CANC |
Jim Soden
|
|
|
07/06/98 347 - diane ###-#### canceled untill 8:30 7/8/8
|