INSP - Plumbing Rough-in | 3/10/1998 | 3/10/1998 | 3/11/1998 | A | PASS |
Gary Ziegler
|
|
|
03/10/98 334 - partial sewer, final air test ok final final after paving
|
INSP - Plumbing Rough-in | 3/9/1998 | 3/9/1998 | 3/9/1998 | P | NR |
Bill VanDegrift
|
|
|
03/09/98 330 - SEWER--PAGE ###-#### gave to gary
|
INSP - Framing/ Rough-in | 3/6/1998 | 3/6/1998 | 3/6/1998 | | PART |
Bill VanDegrift
|
|
|
/ / 330 - MANDRAL BETWEEN MH'S LAMP OK STILL NEEDS AIR TEST ON TWO UPP GROUT
|
INSP - Plumbing Rough-in | 3/6/1998 | 3/6/1998 | 3/6/1998 | P | PART |
Bill VanDegrift
|
|
|
03/06/98 330 - AIR TEST AND MAN DRILL MIKE ###-#### AIRTEST BETWEEN THE 2 MANHOLES OK
|
INSP - Plumbing Rough-in | 3/5/1998 | 3/5/1998 | 3/6/1998 | P | PART |
Gary Ziegler
|
|
|
03/05/98 334 - SEWER FOR ANNIVERSARY INN---MIKE ###-####
|