INSP - Final | 5/8/1998 | 5/8/1998 | 5/11/1998 | P | PASS |
Gary Ziegler
|
|
|
05/08/98 334 - DAVE/###-#### - REINSPECTION. ###-####
|
INSP - Plumbing Rough-in | 4/8/1998 | 4/8/1998 | 5/1/1998 | P | CANC |
Stan Johnson
|
|
|
|
INSP - Plumbing Rough-in | 4/8/1998 | 4/9/1998 | 4/9/1998 | A | PASS |
Gary Ziegler
|
|
|
04/09/98 334 - Scheduled by Hello!. Contact phone is [3715319].
|
INSP - Framing/ Rough-in | 4/8/1998 | 4/8/1998 | 4/8/1998 | | NR |
Bill VanDegrift
|
|
|
/ / 330 - NOT READY AT 3 PM
|
INSP - Plumbing Rough-in | 4/8/1998 | 4/8/1998 | 4/8/1998 | | FAIL |
Bill VanDegrift
|
|
|
04/08/98 330 - NO TEST ON THE WASTE
|