Final | 11/10/2003 | 11/18/2003 | 11/18/2003 | A | PASS |
Jim Johnson
|
|
|
Debra ###-####
|
PLM-Request for Extension | 11/10/2003 | 11/10/2003 | 11/10/2003 | P | DONE |
Jim Johnson
|
|
|
extended per Lee.
|
INSP - Plumbing Rough-in | 11/24/1998 | 11/25/1998 | 11/25/1998 | A | PASS |
Stan Johnson
|
|
|
11/25/98 352 - Debbie, ###-#### - reinspect
|
INSP - Plumbing Rough-in | 8/26/1998 | 8/26/1998 | 8/26/1998 | P | PASS |
Stan Johnson
|
|
|
08/26/98 352 - water is ready for pressure test rough in inspection. deb
|
INSP - Plumbing Rough-in | 4/28/1998 | 4/29/1998 | 4/29/1998 | A | NH |
Stan Johnson
|
|
|
04/29/98 352 - debbie drinkard conf. ###-#### called no answer left no access sticker
|