INSP - Final | 2/18/1999 | 2/19/1999 | 2/19/1999 | A | PASS |
Gary Ziegler
|
|
|
02/19/99 334 - ###-#### Jennifer
|
INSP - Final | 2/18/1999 | 2/18/1999 | 2/18/1999 | P | NR |
Gary Ziegler
|
|
|
Scheduled by Hello!. Contact phone is [3224844].
|
INSP - Plumbing Rough-in | 11/18/1998 | 11/19/1998 | 11/19/1998 | A | PART |
Jim Soden
|
|
|
11/19/98 347 - JENNIFER ###-#### THE BASEMENT RESTROOM ON NORTH END basement north public (2) rough-in o/k
|
INSP - Plumbing Rough-in | 10/13/1998 | 10/13/1998 | 10/13/1998 | P | |
|
|
|
JENNIFER ###-#### IN THE BASEMENT GRIDLINES B12 JUST A SINK
|
INSP - Plumbing Rough-in | 10/7/1998 | 10/7/1998 | 10/7/1998 | P | PART |
Jim Soden
|
|
|
10/07/98 347 - Scheduled by Hello!. Contact phone is [3224844]. assorted exposed 2" vents from basement thru roof
|
INSP - Plumbing Rough-in | 9/15/1998 | 9/16/1998 | 9/16/1998 | A | PASS |
Jim Soden
|
|
|
09/15/98 347 - Scheduled by Hello!. Contact phone is [3224844].
|
INSP - Plumbing Rough-in | 8/20/1998 | 8/20/1998 | 8/20/1998 | P | PART |
Jim Soden
|
|
|
08/20/98 347 - bldg 1 public restrooms 1st and 2nd floor r/i o/k rain dr r/r only o/k 3"and 4"drain and vent to mech room (penthouse) o/k 347
|
INSP - Plumbing Rough-in | 6/29/1998 | 6/30/1998 | 7/1/1998 | P | PART |
Jim Soden
|
|
|
06/29/98 347 - review with lee 347
|
INSP - Plumbing Rough-in | 6/2/1998 | 6/2/1998 | 6/2/1998 | P | PART |
Jim Soden
|
|
|
06/02/98 347 - groundwork partial K12 L6 C6-7 ###-#### Jennifer o/k 347 6/2/8
|
INSP - Plumbing Rough-in | 5/28/1998 | 5/29/1998 | 5/29/1998 | A | PART |
Jim Soden
|
|
|
05/28/98 347 - partial ground work/grid lines a thru m 3 thru 6 o/k 347
|
INSP - Plumbing Rough-in | 5/22/1998 | 5/22/1998 | 5/22/1998 | P | PASS |
Jim Soden
|
|
|
05/22/98 347 - GROUND WORK FOR GRID LINES. D E F G H-12/###-#### JENIFER o/k 347 5/22/8
|
INSP - Plumbing Rough-in | 5/13/1998 | 5/13/1998 | 5/13/1998 | P | PART |
Jim Soden
|
|
|
05/13/98 347 - sub grade g/w r/i basement c-g 8 & 9 o/k 347 5/13/8
|