INSP - Plumbing Rough-in | 5/13/1998 | 5/14/1998 | 5/14/1998 | A | PASS |
Jim Soden
|
|
|
05/14/98 347 - g/w o/k 347 5/14/8
|
INSP - Final | 4/30/1998 | 4/30/1998 | 4/30/1998 | P | PASS |
Jim Soden
|
|
|
sewer replacement final o/k 347 4/30/8
|
INSP - Final | 4/29/1998 | 4/30/1998 | 4/30/1998 | A | NR |
Jim Soden
|
|
|
04/30/98 347 - not ready 347 4/30/8
|