INSP - Final | 6/10/1999 | 6/10/1999 | 6/10/1999 | P | PASS |
Gary Ziegler
|
|
|
06/10/99 334 - FINAL
|
INSP - Final | 4/29/1999 | 4/29/1999 | 4/29/1999 | P | PART |
Bill VanDegrift
|
|
|
04/29/99 330 - 2nd & 8th floors/ before 3:30/ MArk ###-#### temp occ ok
|
INSP - Plumbing Rough-in | 3/18/1999 | 3/18/1999 | 3/18/1999 | P | PASS |
Lee Rice
|
|
|
###-#### richard
|
INSP - Plumbing Rough-in | 1/29/1999 | 1/29/1999 | 2/1/1999 | P | PASS |
Gary Ziegler
|
|
|
01/29/99 334 - mark- ###-#### cell r-/i- 8th floor
|
INSP - Plumbing Rough-in | 1/7/1999 | 1/7/1999 | 1/8/1999 | P | PART |
Gary Ziegler
|
|
|
01/08/99 334 - r/i on the seventh floor before 3:30 Mark ###-####
|
INSP - Plumbing Rough-in | 12/17/1998 | 12/17/1998 | 12/17/1998 | | PART |
Gary Ziegler
|
|
|
12/16/98 334 - RARK ###-#### 6TH FLOOR
|
INSP - Plumbing Rough-in | 12/9/1998 | 12/9/1998 | 12/10/1998 | P | PASS |
Gary Ziegler
|
|
|
12/09/98 334 - mark ###-#### r/i -5th floor
|
INSP - Plumbing Rough-in | 11/23/1998 | 11/23/1998 | 11/24/1998 | P | PART |
Gary Ziegler
|
|
|
11/23/98 334 - mark ###-#### r/i on 4th floor
|
INSP - Plumbing Rough-in | 11/20/1998 | 11/20/1998 | 11/20/1998 | P | FAIL |
Bill VanDegrift
|
|
|
11/20/98 330 - MARK ###-#### R/I-4TH FLOOR noone here at 3:20
|
INSP - Framing/ Rough-in | 11/16/1998 | 11/16/1998 | 11/16/1998 | | PART |
Jim Soden
|
|
|
/ / 347 - conference on clarification of velocity offsets--not in u.p.
|
INSP - Plumbing Rough-in | 11/12/1998 | 11/13/1998 | 11/13/1998 | A | PART |
Jim Soden
|
|
|
11/13/98 347 - 3RD FLOOR--MARK ###-#### water/waste/vent/raiwater
|
INSP - Plumbing Rough-in | 10/23/1998 | 10/26/1998 | 10/26/1998 | A | PART |
Jim Soden
|
|
|
10/25/98 347 - MARK ###-#### 2ND FLOOR 2nd floor waste, vents and water o/k
|
INSP - Plumbing Rough-in | 9/30/1998 | 10/1/1998 | 10/1/1998 | A | PART |
Jim Soden
|
|
|
09/30/98 347 - MARK ###-####-WATER & VENT INSP-ON 1ST FLOOR
|
INSP - Plumbing Rough-in | 9/22/1998 | 9/23/1998 | 9/24/1998 | P | PART |
Jim Soden
|
|
|
09/23/98 347 - basement w,v&water r/i o/k 1st floor w,v & rain r/i o/k 2
|
INSP - Plumbing Rough-in | 7/14/1998 | 7/15/1998 | 7/15/1998 | A | PART |
Jim Soden
|
|
|
07/15/98 347 - ground work sanitary only less pumps o/k 347 7/15/8
|
INSP - Plumbing Rough-in | 7/10/1998 | 7/10/1998 | 7/10/1998 | A | PART |
Jim Soden
|
|
|
conf. with mark about f/d in basement mech room dumping into sanitary drain. no can do. he will have engineer solve this one to our satisfaction 347 7/10/8
|
INSP - Plumbing Rough-in | 7/10/1998 | 7/10/1998 | 7/10/1998 | P | PART |
Jim Soden
|
|
|
conf. with larry about yoke vent---undr 10 storys 347 7/10/8
|
INSP - Plumbing Rough-in | 6/29/1998 | 6/30/1998 | 6/30/1998 | P | PART |
Jim Soden
|
|
|
06/29/98 347 - review with lee 347
|