INSP - Final | 12/18/1998 | 12/18/1998 | 12/18/1998 | P | PASS |
Bill VanDegrift
|
|
|
|
INSP - Final | 12/17/1998 | 12/17/1998 | 12/17/1998 | P | PART |
Bill VanDegrift
|
|
|
larry ###-#### fn- roof drains this was a part ri, roof drain test west side
|
INSP - Final | 12/10/1998 | 12/11/1998 | 12/11/1998 | P | FAIL |
Bill VanDegrift
|
|
|
CASEY ###-#### TEMP OCC still need to get the pressure sewer station on line
|
INSP - Final | 12/8/1998 | 12/9/1998 | 12/9/1998 | P | FAIL |
Bill VanDegrift
|
|
|
LARRY ###-#### PARTIAL FINAL need to have pressure sewer oiperational prior to any temp occ
|
INSP - Plumbing Rough-in | 11/24/1998 | 11/24/1998 | 11/24/1998 | P | PART |
Bill VanDegrift
|
|
|
11/24/98 330 - JEFF ###-#### ROOF DRAINS east side roof drains in wareho
|
INSP - Plumbing Rough-in | 11/12/1998 | 11/12/1998 | 11/12/1998 | P | PART |
Bill VanDegrift
|
|
|
11/12/98 330 - ###-#### office
|
INSP - Plumbing Rough-in | 10/30/1998 | 10/30/1998 | 10/30/1998 | P | FAIL |
Bill VanDegrift
|
|
|
10/30/98 330 - larry ###-#### partial r/i insp gave to lee
|
INSP - Plumbing Rough-in | 10/30/1998 | 10/30/1998 | 10/30/1998 | | PASS |
|
|
|
|
INSP - Plumbing Rough-in | 10/14/1998 | 10/15/1998 | 10/15/1998 | A | PART |
Bill VanDegrift
|
|
|
10/15/98 330 - LARRY ###-#### water system test ok
|
INSP - Plumbing Rough-in | 9/8/1998 | 9/9/1998 | 9/9/1998 | P | PART |
Bill VanDegrift
|
|
|
09/09/98 330 - LARRY ###-#### last of the gw restroom nw corner
|
INSP - Plumbing Rough-in | 8/19/1998 | 8/20/1998 | 8/20/1998 | A | PART |
Bill VanDegrift
|
|
|
08/20/98 330 - LARRY ###-#### UNDERGROUND. interceptor area ok
|
INSP - Plumbing Rough-in | 7/27/1998 | 7/28/1998 | 7/28/1998 | A | PART |
Bill VanDegrift
|
|
|
07/28/98 330 - partial underground/ ###-####
|
INSP - Plumbing Rough-in | 7/10/1998 | 7/13/1998 | 7/13/1998 | A | PART |
Bill VanDegrift
|
|
|
07/13/98 330 - underground/ ###-####partial gw ok core restrooms, branch
|