Final | 4/13/2000 | 4/17/2000 | 4/17/2000 | A | PASS |
Stan Johnson
|
|
|
Scheduled by a contractor via Hello! on 04/13/2000 at 12:53:17. Contact: ###-####.
|
Final | 4/7/2000 | 4/7/2000 | 4/7/2000 | P | PASS |
Stan Johnson
|
|
|
Tom Barrett ###-#### Conference 4/7/00 4:27:38 PM
|
INSP - Plumbing Rough-in | 6/9/1999 | 6/10/1999 | 6/10/1999 | A | PASS |
Stan Johnson
|
|
|
06/10/99 352 - Tom ###-####
|
INSP - Plumbing Rough-in | 5/24/1999 | 5/24/1999 | 5/24/1999 | P | PART |
Stan Johnson
|
|
|
05/24/99 352 - test required
|
INSP - Final | 3/30/1999 | 3/30/1999 | 3/30/1999 | P | FAIL |
Stan Johnson
|
|
|
03/30/99 352 - conections will be dug for inspection drawings will be re
|