Final | 3/10/2000 | 3/13/2000 | 3/13/2000 | A | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 03/10/2000 at 16:26:34. Contact: ###-####.
|
Plumbing Rough-in | 12/14/1999 | 12/15/1999 | 12/15/1999 | A | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 12/14/1999 at 13:28:25. Contact: ###-####.
|
Groundwork | 12/3/1999 | 12/3/1999 | 12/3/1999 | P | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 12/03/1999 at 08:44:16. Contact: ###-####.
|