Final | 11/16/1999 | 11/16/1999 | 11/16/1999 | P | PASS |
Stan Johnson
|
|
|
Scheduled by a contractor via Hello! on 11/16/1999 at 08:23:30. Contact: ###-####.
|
Final | 10/22/1999 | 10/22/1999 | 10/22/1999 | P | PASS |
Stan Johnson
|
|
|
gaylen-- on site--or ted--- ###-#### fn Rough in complete (not a final) (change to R/I 2 hrs ??)
|
Plumbing Rough-in | 9/22/1999 | 9/22/1999 | 9/22/1999 | P | PASS |
Stan Johnson
|
|
|
water r/i ###-#### overhead water lines from old building to new RP then to humidifier
|
Plumbing Rough-in | 9/17/1999 | 9/20/1999 | 9/20/1999 | A | PART |
Stan Johnson
|
|
|
TED ###-#### RINSPECT; Question root drains, overflow drains, considerate drains
|
Plumbing Rough-in | 9/16/1999 | 9/17/1999 | 9/17/1999 | P | PART |
Stan Johnson
|
|
|
PARTIAL R.D. OK; STAN GET W GAYOEN OF R.M. ON R.D. CONFLICT
|
INSP - Plumbing Rough-in | 6/16/1999 | 6/17/1999 | 6/17/1999 | A | PASS |
Stan Johnson
|
|
|
06/17/99 352 - UNDER GROUND ROOF DRAIN AND AREA DRAIN LINES
|
INSP - Plumbing Rough-in | 6/9/1999 | 6/10/1999 | 6/10/1999 | A | PASS |
Stan Johnson
|
|
|
06/10/99 352 - under ground roof drain line and area drain
|