Final | 9/8/1999 | 9/8/1999 | 9/8/1999 | P | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 09/08/1999 at 08:53:13. Contact: ###-####. 9/8 entered pass. jrb
|
INSP - Plumbing Rough-in | 7/8/1999 | 7/8/1999 | 7/8/1999 | P | PASS |
Gary Ziegler
|
|
|
07/08/99 334 - ###-#### remodel
|