Final | 11/18/1999 | 11/19/1999 | 11/19/1999 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 11/18/1999 at 09:58:23. Contact: ###-####. Final ok.
|
Final | 11/17/1999 | 11/18/1999 | 11/18/1999 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 11/17/1999 at 15:22:40. Contact: ###-####. Temp. occ. Ok, test DCUA.
|
Plumbing Rough-in | 10/13/1999 | 10/15/1999 | 10/15/1999 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 10/13/1999 at 13:09:15. Contact: ###-####. R/I ok
|
Final | 9/9/1999 | 9/9/1999 | 9/9/1999 | P | FAIL |
Bill VanDegrift
|
|
|
reinspection on roof drains ###-####; 9/9 Not ready for final. jrb
|
Plumbing Rough-in | 9/9/1999 | 9/9/1999 | 9/9/1999 | | PART |
Bill VanDegrift
|
|
|
9/9 Partial R/I ok, exterior rain drainage complete. jrb
|
Final | 9/8/1999 | 9/8/1999 | 9/8/1999 | | FAIL |
Bill VanDegrift
|
|
|
CHERYL ###-#### ROOF DRAIN --FN; 9/8 Use correct fittings and glue. jrb
|
INSP - Final | 8/26/1999 | 8/27/1999 | 8/27/1999 | A | FAIL |
Bill VanDegrift
|
|
|
08/27/99 330 - Shyrl ###-#### expose uninspected drain tieing to rain dr
|
INSP - Plumbing Rough-in | 8/5/1999 | 8/5/1999 | 8/5/1999 | P | PART |
Bill VanDegrift
|
|
|
08/05/99 330 - AS LATE AS POSSIBLE OUTSIDE STORM DRAIN. HENRY ###-####
|
INSP - Plumbing Rough-in | 7/23/1999 | 7/23/1999 | 7/23/1999 | P | NR |
Bill VanDegrift
|
|
|
07/23/99 330 - LARRY ###-#### GROUND WORK
|