Final | 2/10/2000 | 2/11/2000 | 2/11/2000 | A | PASS |
Lee Rice
|
|
|
Scheduled by a contractor via Hello! on 02/10/2000 at 14:57:01. Contact: ###-####.
|
Final | 2/8/2000 | 2/8/2000 | 2/8/2000 | P | FAIL |
Gary Ziegler
|
|
|
jody ###-#### needs air gap on RO discharge
|
Plumbing Rough-in | 10/7/1999 | 10/7/1999 | 10/7/1999 | P | PASS |
Gary Ziegler
|
|
|
Jody ###-####\no notes
|
INSP - Plumbing Rough-in | 8/16/1999 | 8/16/1999 | 8/16/1999 | P | PASS |
Gary Ziegler
|
|
|
08/17/99 334 - ###-#### R/I 4 TOILET 3 LAVS 3 TUB/SHOWERS 1 K/S 1 W/H 1 L/T 1 VEG SINK
|