Final | 10/8/1999 | 10/8/1999 | 10/8/1999 | P | PASS |
Stan Johnson
|
|
|
Scheduled by a contractor via Hello! on 10/08/1999 at 11:21:27. Contact: ###-####.
|
INSP - Plumbing Rough-in | 8/23/1999 | 8/24/1999 | 8/24/1999 | A | PASS |
Stan Johnson
|
|
|
08/24/99 352 - ###-#### basic 9 fixtures
|