Final | 2/15/2000 | 2/15/2000 | 2/15/2000 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 02/15/2000 at 09:47:43. Contact: ###-####. Final ok with T&P drain air gap and terminal 90deg. 2/16/00 10:01:53 AM
|
Plumbing Rough-in | 10/20/1999 | 10/21/1999 | 10/21/1999 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 10/20/1999 at 17:02:03. Contact: ###-####. R/I ok
|
INSP - Plumbing Rough-in | 8/26/1999 | 8/27/1999 | 8/27/1999 | A | PASS |
Bill VanDegrift
|
|
|
08/27/99 330 - ###-#### REBECCA REINSPECTION looks like lee did this one
|
INSP - Plumbing Rough-in | 8/25/1999 | 8/26/1999 | 8/26/1999 | A | FAIL |
Bill VanDegrift
|
|
|
08/26/99 330 - rebecca ###-#### waste test failed
|
INSP - Plumbing Rough-in | 8/26/1999 | 8/26/1999 | 8/26/1999 | | PASS |
|
|
|
retest on G/W passed ok.
|