Final | 11/30/1999 | 11/30/1999 | 11/30/1999 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 11/30/1999 at 10:14:51. Contact: ###-####. Final ok.
|
Plumbing Rough-in | 9/21/1999 | 9/22/1999 | 9/22/1999 | A | PASS |
Bill VanDegrift
|
|
|
jeff-- ###-#### r/I R/I ok w/kink under mast tub repaired
|