Final | 10/27/1999 | 10/28/1999 | 10/28/1999 | A | PASS |
Gary Ziegler
|
|
|
DAVE ###-####
|
Plumbing Rough-in | 9/16/1999 | 9/16/1999 | 9/16/1999 | | PASS |
|
|
|
ADD INSPCTN PER 330
|
Plumbing Rough-in | 9/15/1999 | 9/15/1999 | 9/15/1999 | P | FAIL |
Bill VanDegrift
|
|
|
NEEDS TESTS
|
Plumbing Rough-in | 9/8/1999 | 9/8/1999 | 9/8/1999 | P | FAIL |
Gary Ziegler
|
|
|
DAVID ###-####; 9/8 Needs nail plates, secure copper in joists, secure waste under joists. jrb
|