Information based on query as of Wednesday, July 3, 2024.
Permit Information
Permit NumberPLM99-03160
StatusFinaled
Name HOLTE PLUMBING COMPANY
Site Address 6574 S FEDERAL WAY
Project NameMCDONALD'S
Customer Number 
ePlanReview 
Description
9-14-99/new restaurant/initial certificate of value $20,170/mls
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final1/4/20001/5/20001/5/2000APASS
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 01/04/2000 at 17:07:19. Contact: ###-####. Final ok.
Groundwork12/16/199912/16/199912/16/1999PPASS
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 12/16/1999 at 08:29:31. Contact: ###-####. G/W in trash area ok.
Final12/13/199912/13/199912/13/1999AFAIL
DetailsLee Rice
Final12/13/199912/13/199912/13/1999AFAIL
DetailsBill VanDegrift
Final conference with United Water Holti, Boise City, BFP required upstream of booster pump. Multiple inspectors/supervisors at this conference.
Final12/8/199912/9/199912/9/1999ACANC
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 12/08/1999 at 16:40:05. Contact: ###-####. Contractor canceled inspection request.
Final12/9/199912/9/199912/9/1999PPART
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 12/09/1999 at 08:20:41. Contact: ###-####. Verify cross connection protection with United Water rout trash drain to grease interceptor, temp. occ. Ok.
Plumbing Rough-in11/2/199911/2/199911/2/1999PPART
DetailsBill VanDegrift
dennis ###-#### r/I R/I ok, provide architecs trash inclosure piping design for approval, installed without inspection
Plumbing Rough-in10/29/199910/29/199910/29/1999PFAIL
DetailsBill VanDegrift
Dennis ###-#### Water system ok, w & v test failed, hang vents at 4', test roof drains.
Groundwork9/20/19999/21/19999/21/1999APASS
DetailsBill VanDegrift
###-#### pending Arch. Design approval, proceed at own risk
Plumbing Rough-in9/20/19999/20/19999/20/1999PFAIL
DetailsBill VanDegrift
Provide exterior roof drainage plan, provide letter from design prof. approving 3" grease line, provide full sized CO at end of grease line, provide 2" CO every 50'