Groundwork | 11/5/1999 | 11/8/1999 | 11/8/1999 | A | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 11/05/1999 at 13:43:07. Contact: ###-####.
|
Final | 11/2/1999 | 11/2/1999 | 11/2/1999 | P | PART |
Gary Ziegler
|
|
|
janet ###-#### fn insp
|
Plumbing Rough-in | 9/22/1999 | 9/22/1999 | 9/22/1999 | P | PART |
Gary Ziegler
|
|
|
JANET-- ###-#### R/I--LATE PM Ok cover walls and floor except NW bathroom and basement
|