Final | 2/10/2000 | 2/10/2000 | 2/10/2000 | P | PASS |
Bill VanDegrift
|
|
|
###-####
|
Final | 2/3/2000 | 2/4/2000 | 2/4/2000 | A | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 02/03/2000 at 16:47:18. Contact: ###-####. Separate ice bin drain, meet water co.for conference on cross connection. 2/7/00 8:39:50 AM
|
Final | 2/2/2000 | 2/2/2000 | 2/2/2000 | P | PART |
Bill VanDegrift
|
|
|
set all equipment, test backflow preventors, verify cross connection protection on glass washer, provide supply to auto soap by mop sink, provide seperate ice bin drain, temp occ ok
|
Plumbing Rough-in | 1/18/2000 | 1/18/2000 | 1/18/2000 | A | FAIL |
Bill VanDegrift
|
|
|
Move two floor sinks out from under equipment for access.
|
Plumbing Rough-in | 12/22/1999 | 12/22/1999 | 12/22/1999 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 12/22/1999 at 10:03:50. Contact: ###-####. Restroom R/I, correction notice for existing. This was an am inspection.
|
Plumbing Rough-in | 12/22/1999 | 12/22/1999 | 12/22/1999 | A | PART |
Bill VanDegrift
|
|
|
Restroom R/I ok, left correction notice to hang exisiting piping to code.
|
Groundwork | 12/20/1999 | 12/21/1999 | 12/21/1999 | A | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 12/20/1999 at 16:12:42. Contact: ###-####. Tests failed.
|
Groundwork | 10/15/1999 | 10/18/1999 | 10/18/1999 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 10/15/1999 at 15:47:55. Contact: ###-####. G/W ok
|
Groundwork | 10/14/1999 | 10/14/1999 | 10/14/1999 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 10/14/1999 at 11:14:11. Contact: ###-####. New section up front ok to cover
|
Groundwork | 10/13/1999 | 10/13/1999 | 10/13/1999 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 10/13/1999 at 11:29:14. Contact: ###-####. Rest room waste and vent ok
|