Final | 6/9/2000 | 6/9/2000 | 6/9/2000 | P | PASS |
Gary Ziegler
|
|
|
dale ###-####
|
Final | 4/21/2000 | 4/24/2000 | 4/24/2000 | A | PART |
Gary Ziegler
|
|
|
partial\\###-####
|
Plumbing Rough-in | 11/4/1999 | 11/4/1999 | 11/4/1999 | P | PASS |
Gary Ziegler
|
|
|
REINSPECTION DALE ###-####
|
Plumbing Rough-in | 10/19/1999 | 10/20/1999 | 10/20/1999 | A | FAIL |
Gary Ziegler
|
|
|
Dale ###-#### Tests ok, move WB as shower valve from 2x4 exterior wall
|