Final | 1/19/2000 | 1/20/2000 | 1/20/2000 | A | NR |
Bill VanDegrift
|
|
|
Steve ###-####
|
Final | 1/20/2000 | 1/20/2000 | 1/20/2000 | A | PASS |
Bill VanDegrift
|
|
|
Final ok with exisitng sump ad single pump.
|
Final | 1/18/2000 | 1/19/2000 | 1/19/2000 | A | FAIL |
Bill VanDegrift
|
|
|
###-#### Pipe condensate to approved location, plug hole in sump cover. 1/20/00 9:22:52 AM
|
Plumbing Rough-in | 12/9/1999 | 12/10/1999 | 12/10/1999 | A | PASS |
Bill VanDegrift
|
|
|
steve ###-#### Unit c r/I ok
|
Plumbing Rough-in | 12/9/1999 | 12/9/1999 | 12/9/1999 | P | PASS |
Bill VanDegrift
|
|
|
R/I ok.
|
Plumbing Rough-in | 12/6/1999 | 12/6/1999 | 12/6/1999 | P | FAIL |
Bill VanDegrift
|
|
|
Steve ###-#### Provide loading on existing water line, provide plans, use approved hangers on wasted water in ceiling, nail plate, protect PEX from sharp studs above framed wall, provide FD for T&P drain or pipe to exterior with out trapping.
|