Final | 4/5/2000 | 4/5/2000 | 4/5/2000 | P | PASS |
Bill VanDegrift
|
|
|
###-####
|
Final | 3/24/2000 | 3/27/2000 | 3/27/2000 | A | PART |
Bill VanDegrift
|
|
|
ann ###-####test dcva temp occ ok 3/27/00 5:08:55 PM
|
Final | 3/24/2000 | 3/27/2000 | 3/27/2000 | A | PART |
Bill VanDegrift
|
|
|
ann ###-####test dcva temp occ ok 3/27/00 5:08:55 PM
|
Groundwork | 3/2/2000 | 3/2/2000 | 3/2/2000 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 03/02/2000 at 09:07:37. Contact: ###-####. Rain drain from inside foundation to MH 3/3/00 8:41:33 AM
|
Plumbing Rough-in | 1/28/2000 | 1/28/2000 | 1/28/2000 | P | PASS |
Bill VanDegrift
|
|
|
unground --bld 1a & 1b --ann ###-#### r\i already complete on this job 1/31/00 8:50:57 AM
|
Plumbing Rough-in | 1/11/2000 | 1/11/2000 | 1/11/2000 | P | PASS |
Bill VanDegrift
|
|
|
###-#### ann\\ late pm. R/I ok.
|
Plumbing Rough-in | 1/4/2000 | 1/5/2000 | 1/5/2000 | A | FAIL |
Bill VanDegrift
|
|
|
###-####. Needed mechanical inspec. not plbg. inspection.
|
Plumbing Rough-in | 12/28/1999 | 12/29/1999 | 12/29/1999 | A | PART |
Bill VanDegrift
|
|
|
r/i for the overflow Ann ###-#### late am. OFD's ok.
|
Storm Drains | 12/22/1999 | 12/22/1999 | 12/22/1999 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 12/22/1999 at 10:42:53. Contact: ###-####. Roof drain line only ok.
|
Plumbing Rough-in | 10/26/1999 | 10/27/1999 | 10/27/1999 | A | PASS |
Bill VanDegrift
|
|
|
outside water ###-####
|
Plumbing Rough-in | 10/25/1999 | 10/26/1999 | 10/26/1999 | A | PART |
Bill VanDegrift
|
|
|
###-#### R.D. stub out ok, remove PVC FIP from domestic service.
|
Groundwork | 10/21/1999 | 10/22/1999 | 10/22/1999 | A | PART |
Bill VanDegrift
|
|
|
Henry ###-#### ready at 11 S.W. & V. G/W ok
|