Final | 3/7/2000 | 3/7/2000 | 3/7/2000 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 03/07/2000 at 10:20:18. Contact: ###-####. Final ok. 3/8/00 10:05:23 AM
|
Plumbing Rough-in | 12/20/1999 | 12/21/1999 | 12/21/1999 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 12/20/1999 at 13:25:23. Contact: ###-####. R/I ok.
|
Plumbing Rough-in | 12/20/1999 | 12/20/1999 | 12/20/1999 | P | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 12/20/1999 at 09:08:25. Contact: ###-####.
|