Final | 2/10/2000 | 2/11/2000 | 2/11/2000 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 02/10/2000 at 15:28:28. Contact: ###-####. Final ok. 2/14/00 12:12:06 PM
|
Plumbing Rough-in | 11/29/1999 | 11/30/1999 | 11/30/1999 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 11/29/1999 at 16:49:44. Contact: ###-####. R/I ok.
|
Plumbing Rough-in | 11/29/1999 | 11/29/1999 | 11/29/1999 | P | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 11/29/1999 at 09:28:53. Contact: ###-####. Waste test failed.
|