Final | 8/4/2000 | 8/4/2000 | 8/4/2000 | P | PASS |
Bill VanDegrift
|
|
|
Added by Inspector: 330 On 8/4/2000 final ok
|
Final | 7/26/2000 | 7/27/2000 | 7/27/2000 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 07/26/2000 at 13:19:32. Contact: ###-####.
|
Final | 7/21/2000 | 7/21/2000 | 7/21/2000 | P | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 07/21/2000 at 07:43:33. Contact: ###-####. pipe t&p drains to floor 7/21/2000 4:50:02 PM
|
Plumbing Rough-in | 3/28/2000 | 3/28/2000 | 3/28/2000 | A | PASS |
Bill VanDegrift
|
|
|
Added by Inspector: 330On 3/28/00
|
Plumbing Rough-in | 3/27/2000 | 3/27/2000 | 3/27/2000 | P | PART |
Bill VanDegrift
|
|
|
###-####needs hangers, np, isolators 3/27/00 5:15:06 PM
|
Plumbing Rough-in | 3/27/2000 | 3/27/2000 | 3/27/2000 | P | PART |
Bill VanDegrift
|
|
|
###-####needs hangers, np, isolators 3/27/00 5:15:06 PM
|
Plumbing Rough-in | 3/24/2000 | 3/24/2000 | 3/24/2000 | P | PART |
Bill VanDegrift
|
|
|
Part R/I kitchen, bath ceilings 2nd floor.
|
Plumbing Rough-in | 3/23/2000 | 3/23/2000 | 3/23/2000 | A | PART |
Bill VanDegrift
|
|
|
part R/I kitchen, bath ceilings 1st floor.
|
Plumbing Rough-in | 11/15/1999 | 11/16/1999 | 11/16/1999 | A | PART |
Bill VanDegrift
|
|
|
RAUL --###-#### R/I--GROUND WORK G/W ok.
|