Final | 1/11/2000 | 1/12/2000 | 1/12/2000 | A | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 01/11/2000 at 15:34:00. Contact: ###-####.
|
Final | 1/3/2000 | 1/3/2000 | 1/3/2000 | P | PART |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 01/03/2000 at 07:52:23. Contact: ###-####.
|
Plumbing Rough-in | 12/3/1999 | 12/3/1999 | 12/3/1999 | P | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 12/03/1999 at 11:19:19. Contact: ###-####.
|
Groundwork | 11/16/1999 | 11/16/1999 | 11/16/1999 | P | PASS |
Gary Ziegler
|
|
|
MERIDIAN PLUMBING ###-####
|