Final | 11/29/2000 | 11/30/2000 | 11/30/2000 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by Inspector: 330 On 11/29/2000
|
Final | 11/29/2000 | 11/29/2000 | 11/29/2000 | P | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 11/29/2000 at 10:04:01. Contact: ###-####. not all corrections made 11/29/2000 4:09:21 PM
|
Final | 11/28/2000 | 11/28/2000 | 11/28/2000 | P | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 11/28/2000 at 09:02:38. Contact: ###-####. thermol expantion required, turn t&p and pan drains down 11/28/2000 3:17:26 PM
|
Plumbing Rough-in | 7/27/2000 | 7/27/2000 | 7/27/2000 | A | PASS |
Bill VanDegrift
|
|
|
Added by Inspector: 330 On 7/27/2000 sign ri card
|
Groundwork | 11/24/1999 | 11/26/1999 | 11/26/1999 | A | PASS |
Bill VanDegrift
|
|
|
RAUL ###-####
|