Final | 2/2/2001 | 2/6/2001 | 2/6/2001 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 02/02/2001 at 07:41:42. Contact: ###-####.
|
Final | 2/2/2001 | 2/2/2001 | 2/2/2001 | P | PASS |
Bill VanDegrift
|
|
|
Added by Inspector: 330 On 2/2/2001 2:41:09 PM final ok
|
Final | 2/1/2001 | 2/1/2001 | 2/1/2001 | P | FAIL |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 02/01/2001 at 07:52:08. Contact: ###-####. apt. 15 t/p not connected connect dishwasher hose to top of counter apt.22 connect disherhose to disposal apt.32 need hole cover on kit sink toilet [ running ] needs adjustment 2/1/2001 4:24:29 PM
|
Final | 1/26/2001 | 1/29/2001 | 1/29/2001 | A | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 01/26/2001 at 18:20:55. Contact: ###-####. turn down relief lines and open all doors 1/29/2001 9:30:02 AM
|
Final | 1/29/2001 | 1/29/2001 | 1/29/2001 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by Inspector: 330 On 1/29/2001 9:29:34 AM install thermol expantion tank, pipe hose bib by thermol expantion tank temp occ ok 1/29/2001 3:22:51 PM
|
Final | 9/8/2000 | 9/11/2000 | 9/11/2000 | A | FAIL |
Bill VanDegrift
|
|
|
Scheduled by Inspector: 330 On 9/8/2000 could not find a final that was ready on site???? is this a r/i ? left a message with Raweul at ###-#### 9/11/2000 11:03:34 AM
|
Final | 9/8/2000 | 9/8/2000 | 9/8/2000 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 09/08/2000 at 07:10:14. Contact: ###-####.rescheduled for mondat 9/11 9/8/2000 3:57:33 PM
|
Plumbing Rough-in | 8/30/2000 | 8/30/2000 | 8/30/2000 | A | PASS |
Bill VanDegrift
|
|
|
Added by Inspector: 330 On 8/30/2000
|
Plumbing Rough-in | 8/29/2000 | 8/29/2000 | 8/29/2000 | P | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 08/29/2000 at 10:16:13. Contact: ###-####.not ready
|
Groundwork | 11/30/1999 | 12/1/1999 | 12/1/1999 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 11/30/1999 at 15:40:45. Contact: ###-####. G/W ok.
|