Final | 2/3/2000 | 2/4/2000 | 2/4/2000 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 02/03/2000 at 14:43:36. Contact: ###-####. Final ok. 2/7/00 8:40:13 AM
|
Final | 2/3/2000 | 2/3/2000 | 2/3/2000 | P | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 02/03/2000 at 09:31:15. Contact: ###-####. Set all fixtures, test premis protection, turn on water. 2/4/00 11:36:50 AM
|
Plumbing Rough-in | 1/4/2000 | 1/5/2000 | 1/5/2000 | A | PASS |
Bill VanDegrift
|
|
|
###-#### KEITH. R/I ok.
|
Plumbing Rough-in | 12/28/1999 | 12/29/1999 | 12/29/1999 | A | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 12/28/1999 at 09:43:55. Contact: ###-####. Piping incomplete, needs testing.
|
Plumbing Rough-in | 12/28/1999 | 12/28/1999 | 12/28/1999 | P | CANC |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 12/28/1999 at 09:24:22. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 12/28/1999 at 09:42:18.
|
Groundwork | 12/2/1999 | 12/3/1999 | 12/3/1999 | P | PASS |
Bill VanDegrift
|
|
|
KEITH ###-#### G/W ok.
|