Final | 11/13/2000 | 11/13/2000 | 11/13/2000 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 11/13/2000 at 10:05:49. Contact: ###-####.
|
Final | 10/24/2000 | 10/24/2000 | 10/24/2000 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 10/24/2000 at 07:22:07. Contact: ###-####. ok with 90 o t&p discharge and water tight seals on drip pans 10/24/2000 10:48:44 AM
|
Final | 10/20/2000 | 10/20/2000 | 10/20/2000 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 10/20/2000 at 08:08:19. Contact: ###-####. t&p and pan drains incomplete 10/20/2000 3:34:31 PM temp occ ok 10/20/2000 3:45:59 PM
|
Plumbing Rough-in | 7/21/2000 | 7/21/2000 | 7/21/2000 | P | PART |
Bill VanDegrift
|
|
|
Added by Inspector: 330 On 7/21/2000 ok to cover walls bld 10 recieved letter on waterheater freezing potential 7/21/2000 4:53:16 PM
|
Plumbing Rough-in | 5/31/2000 | 6/1/2000 | 6/1/2000 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 05/31/2000 at 12:54:04. Contact: ###-####.
|
Plumbing Rough-in | 5/22/2000 | 5/22/2000 | 5/22/2000 | P | FAIL |
Bill VanDegrift
|
|
|
###-#### provide heat for water heater room, provide r-13 min. behind kitchen sink water in west 1/2 of this bldg. 5/22/00 3:26:21 PM
|
Groundwork | 12/21/1999 | 12/21/1999 | 12/21/1999 | P | PASS |
Bill VanDegrift
|
|
|
raul ###-#### ground work. G/W ok.
|