Final | 3/28/2000 | 3/28/2000 | 3/28/2000 | P | PASS |
Stan Johnson
|
|
|
Scheduled by a contractor via Hello! on 03/28/2000 at 09:12:52. Contact: ###-####.
|
Plumbing Rough-in | 12/28/1999 | 12/28/1999 | 12/28/1999 | A | PASS |
Stan Johnson
|
|
|
Scheduled by a contractor via Hello! on 12/28/1999 at 07:10:45. Contact: ###-####.
|
Plumbing Rough-in | 12/27/1999 | 12/27/1999 | 12/27/1999 | P | FAIL |
Stan Johnson
|
|
|
MIKE ###-####. 2" waste line needs 45 deg. offset.
|