Final | 2/17/2000 | 2/18/2000 | 2/18/2000 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 02/17/2000 at 15:57:12. Contact: ###-####. Final ok with hosebibs secured. 2/22/00 10:04:44 AM
|
Plumbing Rough-in | 1/3/2000 | 1/3/2000 | 1/3/2000 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 01/03/2000 at 11:14:56. Contact: ###-####. R/I ok.
|