Information based on query as of Monday, May 20, 2024.
Permit Information
Permit NumberBLD06-02316
StatusFinaled
Name ESI
Site Address 3075 W CRESCENT RIM DR
Project NameCrescent Rim #1 - Footings etc
Customer NumberPERMIT IS IN E PLAN
ePlanReviewNo
Description
(CRESCENT RIM RESIDENTIAL CONDOMINIUM BUILDING #1 – PARKING GARAGE, FOOTINGS, AND FOUNDATION – DRH05-00397, DRH18-00199, AND CUP05-00015) The NFPA 13-R fire sprinkler system will be used for occupancy (NFPA 13 for garage). (11-28-18 PLAN MODIFICATION TO REVISE TWO COLUMN FOOTINGS TO ACCOMMODATE EXISTING CONDITIONS (I.E. PROVIDE A MAT FOOTING FOR ONE COLUMN AND TO ATTACH THE OTHER COLUMN TO A FOUNDATION WALL), TO PROVIDE A WIDER CONCRETE FOOTING THAN FORMERLY DESIGNED, TO PROVIDE A NEW SOIL RETAINING WALL AT AN EXISTING OPENING IN THE CONCRETE WALL OF THE BASEMENT GARAGE, AND TO PROVIDE HEADER REINFORCEMENT DETAILS FOR A NEW 42” X 42” EXHAUST AIR OPENING IN THE EXISTING CONCRETE WALL OF THE BASEMENT GARAGE.) This project description replaces all previous descriptions for the parking garage, footings, and foundations. The 3 story apartment building with 19 dwelling units located above the parking garage having 38 parking spaces and additional work within the garage (i.e. interior finishes, electrical, plumbing, mechanical, elevators, etc.) will be constructed under permit BLD06-02322. Existing and new work is required to comply with all applicable codes and ordinances in effect on August 11, 2006, the original date of permit application (e.g. 2003 IBC). To construct new concrete footings and foundations around a previously approved 17,726 square foot post tensioned concrete deck located at grade to support the expanded 3 story residential condominium building that will be constructed under permit BLD06-02322. The work is to include concrete footings, concrete piers, concrete stem walls, concrete slabs on grade, slab edge insulation, and hold downs for future shear walls. No vertical construction above the concrete foundations is allowed under this permit. Drawings showing work above the foundations are for reference only. Special Inspection is required for soils, concrete, and post-installed anchors in hardened concrete. Before any holes are drilled through or into the post tensioned concrete deck, rebar is required to be located (e.g. scanned with ground penetrating radar), to precisely determine the location of concrete reinforcement. No concrete reinforcement is allowed to be cut, including post tensioned cables. This requirement applies to holes for anchor bolts, plumbing pipes, electrical conduit, etc. The work is required to comply with the approved drawings, with the plan review report, with the Structural Engineer’s design, and with all applicable codes and ordinances. This permit is not intended to establish a Certificate of Occupancy for any portion of this building. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/12/20202/12/20202/12/2020PPASS
DetailsJim Storey
DOC - Permit Finaled2/12/20202/12/20202/12/2020PPASS
DetailsJim Storey
Letter of compliance/Occupancy  2/12/2020 DONE
Letter of compliance/Occupancy  2/12/2020 DONE
Letter of compliance/Occupancy  2/12/2020 DONE
Letter of compliance/Occupancy  2/12/2020 DONE
Letter of compliance/Occupancy  2/12/2020 DONE
BLD-Final1/30/20201/31/20202/3/2020PPASS
DetailsJim Storey
lee Phone #: ###-####
BLD-Aging Inspection1/24/20201/24/20201/30/2020 PASS
DetailsJim Storey
BLD-Other10/11/201910/11/201910/11/2019PPASS
DetailsJim Storey
fire culking // Lee Scott Phone #: ###-####
BLD-Aging Inspection9/12/20199/12/20199/12/2019 PASS
DetailsJim Storey
wip
BLD-Aging Inspection9/11/20199/11/20199/12/2019 PASS
DetailsJim Storey
wip
BLD-Framing/Rough-in5/2/20195/3/20195/3/2019ACANC
DetailsJim Sly
Lee- area A 3rd floor Phone #: ###-####
BLD-Framing/Rough-in4/30/20194/30/20194/30/2019PPART
DetailsJim Sly
inspection for area A 3rd floor- Lee Phone #: ###-####
1st walk thru......Framing Generally appears OK. Need to complete all trade rough-in inspections Provide listings for all firestopping......complete firestopping per listings.
BLD-Other4/9/20194/10/20194/10/2019PPART
DetailsJim Sly
roof nailing // Lee Phone #: ###-####
BLD-Wall Bracing3/21/20193/21/20193/21/2019PPART
DetailsJim Sly
Lee Phone #: ###-####
North 1/2 of structure........OK.
BLD-Footing1/30/20191/31/20191/31/2019APART
DetailsDave Hannah
Lee Phone #: ###-#### ok after spec inspection oks
BLD-Footing1/24/20191/25/20191/25/2019APART
DetailsJim Storey
Lee Scott Phone #: ###-#### wip si pending grade beam and ft with colms south east coner 60 inch culvert.
BLD-Footing1/2/20191/3/20191/3/2019APART
DetailsBrandon Shaw
OK pending STRATA special insp. tests and approvals.
BLD-Footing12/19/201812/20/201812/20/2018APART
DetailsJim Sly
Lee Scott Phone #: ###-####
Southwest corner of Bldg....OK pending STRATA special insp. tests and approvals.
BLD-Foundation11/30/201812/3/201812/3/2018PPART
DetailsJim Sly
Lee Phone #: ###-####
Select Walls OK pending STRATA special inspections, tests and approvals .........and cold weather provisions per ACI 318 standards.
BLD-Footing11/28/201811/29/201811/29/2018APART
DetailsJim Storey
Lee Phone #: ###-#### placed w s/i
OVERRIDE  11/28/2018  
OVERRIDE  11/28/2018  
Plan assigned to (CJW)10/16/201810/16/201811/28/2018 PASS
DetailsCarl Westfall
Plan mod - Crescent Rim foundation - 11-27-18 routed to Consultant Structural Engineer
CHANGE STATUS TO (ISS)  11/28/2018 DONE
Inspection Record Card- Bld  11/28/2018 DONE
Routing Off Site - STRUCTURAL11/27/2018 11/28/2018 PASS
DetailsCarl Westfall
Chris Merrill (Stapley)
Plan Reviewer's activity  11/28/2018 PASS
Plan mod approved
Permit Ready to Issue  11/28/2018 DONE
PLAN MOD ***need to also pay for ESC06-01306, reprint esc permit, have customer sign conditions, and they need site ESC sign.//see notes in esc permit activities***
Plan resubmittals requested  11/27/2018 DONE
Plan resubmittals received  11/27/2018 DONE
Routing - PLAN CHECK11/27/2018 11/27/2018 PASS
DetailsCarl Westfall
Plan resubmittals requested  11/26/2018 DONE
Thanksgiving week. Plans Examiner gone Wednesday through the end of the week. Routing finished on Monday.
Plan resubmittals received  11/26/2018 DONE
Routing - PLAN CHECK11/26/2018 11/26/2018 PASS
DetailsCarl Westfall
Routing Off Site - STRUCTURAL11/26/2018 11/26/2018 FAIL
DetailsCarl Westfall
Chris Merrill (Stapley)
BLD-Foundation11/20/201811/21/201811/21/2018APART
DetailsJim Storey
Lee Phone #: ###-#### placed with si pending reports
Routing Off Site - STRUCTURAL11/14/2018 11/21/2018 FAIL
DetailsCarl Westfall
Chris Merrill (Stapley)
Routing - PLAN CHECK11/13/2018 11/14/2018 PASS
DetailsCarl Westfall
Plan resubmittals received  11/13/2018 DONE
DetailsCarl Westfall
Plan resubmittals requested  11/8/2018 DONE
Routing Off Site - STRUCTURAL10/23/2018 11/7/2018 FAIL
DetailsCarl Westfall
Chris Merrill (Stapley)
Routing - PLAN CHECK10/22/2018 10/23/2018 PASS
DetailsCarl Westfall
Back from the front desk
Plan Modification Accepted  10/22/2018 DONE
Finally got the needed information from the Architect to process the plan mod. Sheet A2.10 had been revised to show only one opening instead of 2.
Plan Modification Accepted  10/17/2018 DONE
DetailsCarl Westfall
Drawings uploaded
Plan Modification Accepted  10/16/2018 DONE
Plan Mod - Minor modifications to two column footings to accommodate existing conditions. Addition of
details to accommodate new exhaust fan opening in garage wall, and new garage air intake well.
CHANGE STATUS TO (ISS)  10/9/2018 DONE
Inspection Record Card- Bld  10/9/2018 DONE
OVERRIDE  10/5/2018  
Plan assigned to (CJW)8/16/20188/16/201810/5/2018 PASS
DetailsCarl Westfall
(2nd done) 09/05/18 (15 days) (ePlan - 22 sheets) - Plan Mod - Crescent Rim
PLANS/APPL TAKEN TO FRONT DESK  10/5/2018 DONE
Permit Ready to Issue  10/5/2018 DONE
Need
GC Form

Plan Mod Approved
Do not reissue (plan mod fee due)
Routing Off Site - STRUCTURAL9/27/2018 10/4/2018 PASS
DetailsCarl Westfall
Chris Merrill (Stapley)
Routing PW Solid Waste9/27/2018 10/3/2018 PASS
DetailsEvan Carpenter
Routing - PLAN CHECK9/26/2018 9/27/2018 PASS
DetailsCarl Westfall
Pending approval by Structural
Plan resubmittals received  9/26/2018 DONE
1st review completed  9/25/2018 DONE
Plan resubmittals requested  9/25/2018 DONE
Routing - PLAN CHECK9/4/2018 9/25/2018 PASS
DetailsCarl Westfall
Pending structural
Routing PW Environmental9/4/2018 9/21/2018 PASS
DetailsTerry Alber
Parking garage floor drains appear to go to sewer through oil/sediment interceptor.
Routing Off Site - STRUCTURAL9/4/2018 9/18/2018 FAIL
DetailsCarl Westfall
Chris Merrill (Stapley)
Routing - Erosion and Sediment9/4/2018 9/13/2018 PASS
DetailsAndy J. Long
ESC plan approved. Certified PD and RP. Site preparation inspeciton required.
Routing PW Sewer Rating9/4/2018 9/10/2018 PASS
DetailsMorgan Webb
FUTURE PERMITS WILL HAVE FIXTURE COUNTS.
Routing - PUBLIC WORKS9/10/2018 9/10/2018 PASS
DetailsMorgan Webb
Routing - Design Review9/4/2018 9/6/2018 PASS
DetailsJosh Wilson
Parking garage/foundation only. Approval of above-grade improvements subject to original DR approval and subsequent modifications.
Routing - Addressing9/4/2018 9/5/2018 PASS
DetailsDoug Chausow
Address corrected to: 3075 W Crescent Rim Dr.
Routing PW Grading-Hillside9/5/2018 9/5/2018 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Routing PW Solid Waste9/4/2018 9/4/2018 FAIL
DetailsEvan Carpenter
The solid waste room must have a door opening at least 8 feet wide.

There must be an access ramp that allows the containers to be transported to a loading area for servicing within 15 feet of the solid waste room door; the pathway is currently blocked by parking spaces and landscaping.
Plan Reviewer's activity  9/4/2018 DONE
Carl Westfall routed the drawings
Routing - PLANNING9/4/2018 9/4/2018 PASS
DetailsCody Riddle
Parking garage/foundation only. Approval of above-grade improvements subject to original DR approval and subsequent modifications.
Plan Reviewer's activity  8/31/2018 PASS
DetailsCarl Westfall
Plan intake review approved
Plan Modification Accepted  8/31/2018 PASS
Permit Desk completed their role after plan mod plan intake review was approved
Intake Approval  8/29/2018 FAIL
DetailsCarl Westfall
Please refer to the items noted on the plan intake checklist in the "documents" folder. Resolve each item as directed. JHB
Route to Impact Fee Review8/16/20188/19/20188/20/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Plan Modification Accepted  8/16/2018 DONE
Plan Modification workflow started for review as per CJW & Architects direction - Where foundations and footings occur beyond the already-built parking garage deck,
adjustments to overall building footprint (already approved in DRH18-00199) necessitate
adjustments to foundation conditions from the original 2006 permitted design.
BLD-Aging Inspection10/22/201510/22/201510/22/2015 PEND
DetailsPhil Shearer
BLD-Aging Inspection7/23/20157/23/20157/23/2015 PEND
DetailsPhil Shearer
BLD-Aging Inspection4/22/20154/22/20154/22/2015 PEND
DetailsPhil Shearer
BLD-Aging Inspection1/21/20151/21/20151/21/2015 PART
DetailsPhil Shearer
BLD-Aging Inspection10/22/201410/22/201410/22/2014 PART
DetailsPhil Shearer
Work in progress
BLD-Aging Inspection4/17/20144/17/20144/17/2014 DONE
DetailsTom Arcoraci
BLD-Aging Inspection1/16/20141/16/20141/21/2014 PEND
DetailsTom Arcoraci
BLD-Aging Inspection10/8/201310/8/201310/8/2013 PEND
DetailsTom Arcoraci
BLD-Aging Inspection7/9/20137/9/20137/9/2013 PEND
DetailsTom Arcoraci
BLD-Aging Inspection4/9/20134/9/20134/9/2013 PEND
DetailsTom Arcoraci
BLD-Aging Inspection1/8/20131/8/20131/8/2013 PEND
DetailsTom Arcoraci
BLD-Aging Inspection10/9/201210/9/201210/9/2012 PEND
DetailsTom Arcoraci
BLD-Aging Inspection7/10/20127/10/20127/10/2012 PEND
DetailsTom Arcoraci
BLD-Aging Inspection4/10/20124/10/20124/10/2012 PEND
DetailsTom Arcoraci
BLD-Aging Inspection1/10/20121/10/20121/11/2012 PASS
DetailsTom Arcoraci
Inspection Record Card- Bld  1/11/2012 DONE
BLD-Aging Inspection10/11/201110/11/201110/11/2011 PASS
DetailsTom Arcoraci
PubWorks Occupancy Approval10/10/201110/10/201110/10/2011 DONE
DetailsTiffany Lowery
BLD-Aging Inspection7/12/20117/12/20117/12/2011 PASS
DetailsTom Arcoraci
BLD-Aging Inspection4/11/20114/11/20114/11/2011 PART
DetailsTom Arcoraci
BLD-Aging Inspection2/7/20112/7/20112/7/2011 PEND
DetailsTom Arcoraci
BLD-Aging Inspection12/6/201012/6/201012/6/2010 PART
DetailsTom Arcoraci
no
BLD-Aging Inspection10/4/201010/4/201010/4/2010 PART
DetailsTom Arcoraci
BLD-Aging Inspection8/2/20108/2/20108/2/2010 PART
DetailsTom Arcoraci
BLD-Aging Inspection5/31/20105/31/20106/2/2010 PASS
DetailsTom Arcoraci
BLD-Aging Inspection3/29/20103/29/20103/29/2010 PASS
DetailsTom Arcoraci
Case Summary (BLD)  3/15/2010 DONE
BLD-Aging Inspection1/26/20101/26/20101/26/2010 PASS
DetailsTom Arcoraci
BLD-Other11/23/200911/23/200911/23/2009PPASS
DetailsTom Arcoraci
BLD-Aging Inspection11/23/200911/23/200911/23/2009 PASS
DetailsTom Arcoraci
BLD-Aging Inspection9/22/20099/22/20099/22/2009 PASS
DetailsTom Arcoraci
BLD-Aging Inspection7/20/20097/20/20097/20/2009 PASS
DetailsTom Arcoraci
BLD-Aging Inspection5/18/20095/18/20095/18/2009 PASS
DetailsTom Arcoraci
BLD-Aging Inspection3/16/20093/16/20093/16/2009 PASS
DetailsTom Arcoraci
BLD-Aging Inspection1/12/20091/12/20091/12/2009 NR
DetailsTom Arcoraci
BLD-Aging Inspection11/11/200811/11/200811/12/2008 CANC
DetailsTom Arcoraci
DOC - Permit Finaled11/12/200811/12/200811/12/2008PCANC
DetailsTom Arcoraci
(This activity was added in error so we have changed the case status back to Issued.)
CHANGE STATUS TO (ISS)  11/12/2008  
per tom a. done in error
Meeting  8/7/2008 DONE
Meeting with Architect, Andy Erstad and the general contractor, Sam Rogers and George Slane, to discuss their proposal to allow the basement mechanical room to be approved for occupancy without installing sprinklers in the basement. Due to economic circumstances, they do not intend to build the upper portion of the building at this time. They do not intend to use the parking garage for vehicle parking, but they need occupancy approval for the mechanical room to provide HVAC for the detached Bldg 2/3. The basement requires sprinkler protection for occupancy (due to size); partial sprinklers within the Mechanical room itself would not provide protection for safe occupancy and egress via the 2 required exits. They proposed partial smoke detection as an alternative but an alarm is not equivalent to sprinkler protection. Sam Rogers proposed Fire would consider an alternative to fully sprinkler approximately one-half of the basement area, encompassing both access/egress ways, the Mechanical room, the electrical panel, the fire sprinkler riser and 20' beyond this area, with the condition that no combustibles would be allowed within the non-sprinklered area. They indicated they will discuss this option with the owners and decide a course of action. D. Hanneman subsequently confirmed he would consider that as an acceptable alternative, for temporary occupancy, if they choose to propose it.
BLD-Aging Inspection6/9/20086/9/20086/9/2008 PASS
DetailsTom Arcoraci
BLD-Aging Inspection1/9/20081/9/20081/9/2008 PASS
DetailsTom Arcoraci
BLD-Aging Inspection10/31/200710/31/200710/31/2007 NR
DetailsTom Arcoraci
BLD-Aging Inspection8/30/20078/30/20078/30/2007 NR
DetailsTom Arcoraci
BLD-Foundation5/18/20075/21/20075/21/2007APART
DetailsTom Arcoraci
Special inspection by Strata. Pouring at noon. Phone #: ###-#### Internet Inspection Request from: Bob Thornton
BLD-Foundation3/23/20073/26/20073/26/2007APASS
DetailsMike Jordan
Pouring at noon Phone #: ###-####. Reviewed all special insp. reports to date. Everything ok, no non conformances noted.
Telephone call  3/2/2007 DONE
Review of emailed sketch and request from TVFP for approval of new spk FDC and Standpipe FDC locations; review of garage plans, emails to DH; reco'd we defer meeting until "real" plans are submittted.
(F) Reprint permit  12/21/2006  
Plan assigned to (M_P)8/14/20068/14/200612/20/2006 PASS
12/20/2006 09:18:52 M_P - activity updated through activity BLDA022 from case BLD06-02316.
Routing - PLANNING12/18/2006 12/20/2006 PASS
Waiting for recorded easement.

Approved per the DR and the CUP
Routing - PLAN CHECK12/20/2006 12/20/2006 PASS
PLANS/APPL TAKEN TO FRONT DESK  12/20/2006 DONE
Inspection Record Card- Bld  12/20/2006 DONE
Telephone call  12/20/2006 DONE
called ###-#### and left message for Dave Holm that permit is ready
Permit Ready to Issue  12/20/2006 DONE
Issue PAID IN FULL permit  12/20/2006 DONE
Routing - PLAN CHECK12/15/2006 12/18/2006  
Routing to Planning.
Routing Off Site - STRUCTURAL12/4/2006 12/18/2006 PASS
8-1/2" x 11" resubmittals received 12/4/06 sent to outside engineer via Action Couriers.
Routing - FIRE12/15/2006 12/15/2006 PASS
Attached updated review comments to plans.
Routing Off Site - STRUCTURAL12/14/2006 12/15/2006 PASS
Called action Courier for pick up of 1 structural calcs book volume 2///12/14/06 @ 3:55
Routing - PLAN CHECK12/12/2006 12/15/2006 PEND
Waiting for others to approve prior toissuing permit.
Routing - PLUMBING12/11/2006 12/12/2006 PASS
Resubmittals from Bob Tikker included. garage only, venting of garage drainage must be per upc 910.3- vent upper terminal waste lines over 15'.
Plan resubmittals received  12/11/2006  
Received three copies of the following pages: A300, A310, A320, A321. Received 4 copies of the following pages: C3.1, C5.0; taken to Mike Phillips
Plan resubmittals received  12/8/2006  
Received 2 copies of structural calcs for wood permit submittal- volumes 1 & 2, 3 copies of the following sheets--S2.07, S2.08, S2.09, S2.10, S2.12W, S2.13, S2.14, S2.15, S2.16, S2.18W, S2.19, S2.20, S2.21, S5.00, S5.01, S5.02, S5.03, S5.04, S6.00, S1.00, S1.01, S2.01W, S2.02, S2.03, S2.04, S2.06W and 1 set of everything sent to outside Structural engineer and the rest taken to Mike Phillips
Plan resubmittals received  12/8/2006  
Received 4 copies of sheets A001, A200, A201, A205, A206, A211, A212, A217, A218 and taken to Mike Phillips
Routing - PLANNING12/4/2006 12/8/2006 FAIL
Sarah Schafer
Failed DR and CUP review. Letter being sent to applicant with explination. Still needs drainage easement shown on plans, elevations that match DR approved, pork chop in Peasly Dr.
Routing - PLANNING Land Div12/8/2006 12/8/2006 PASS
Parcels combined into one parcel. Applicant submitted recorded Notice of Buildable Parcel, Deed and New Tax Parcel Number.
Plan resubmittals received  12/7/2006  
Received 1 copy of pages M100, M200, M201, M202, M203; taken to Mike Phillips
Plan resubmittals received  12/6/2006  
Received 3 sets of DR meeting of floor plan & elevations and taken tot Mike Phillips
Plan resubmittals received  12/4/2006 DONE
Received Structural Engineer resubmittals in the form of 1 cover letter; 1 copy of responses to building review comments w/additional structural calculations; 1 copy of geotechnical addendum dated 7/7/06. Copy given to Mike Phillips and sent to outside engineer for review.
Routing - PLUMBING12/4/2006 12/4/2006 FAIL
no plans
Routing - PLAN CHECK10/16/2006 12/4/2006  
Routing resubmittals to plumbing, planning, land division and fire.
Plan resubmittals received  11/24/2006  
Inserted new sheet into the plans on 11/28/06/ Received transmittal sheet, three copies of 12pg. letter of response, three copies of application for Project Start Up for Special Inspections, 2pg. repsonse letter from Tikker Eng., 11pg. electrical response, 17pgs. on Fire Suppression, two copies of the following pages: FP100, FP101, FP102, FP103, FP104, FP105, FP106, FP107, FP108, FP109, FP110; four copies of the following pages: L101, M500, M504, M509, M514, E1.9, E2.1.1L, E2.2.0L, E2.2.1L, E2.3.0L, E2.3.1L, E2.4.1L; five copies of the following pages: A001, A002, A003, A010, A011, A012, A013, A014, A100, A101, A102, A110, A111, A112, A113, A114, A115, A200, A201, A202, A203, A204, A205, A206, AA207, A208, A209, A210, A211, A212, A213, A214, A215, A216, A217, A218, A219, A220, A221, A230, A231, A232, A233, A234, A235, A236, A237, A238, A239, A240, A241, A242, A243, A244, A245, A246, A247, A248, A249, A260, A261, A262, A270, A271, A272, A300, A301, A302, A303, A304, A305, A330, A360, A361, A362, A363, A364, A365, A500, A700, A701, A702, A703, A704, A705, A706, A707, A710, A800, A801, A802, A803, A804, A810, A821, A900, A902; taken to Mike Phillips
Plan Reviewer's activity  10/16/2006 DONE
Faxed Modified review comments to architect.
Routing - FIRE10/12/2006 10/13/2006 FAIL
Faxed resubmittal items to architect. Attached review comments to plans.
Routing - PLAN CHECK10/9/2006 10/12/2006  
Routing to Fire
Routing - PLAN CHECK9/25/2006 10/9/2006 FAIL
Sent correction report to the architect, requesting additional information to be submitted for further review prior to issuing permit.
1st review completed  10/9/2006 FAIL
DetailsMike Phillips
Routing - FIRE9/21/2006 9/25/2006 FAIL
Faxed resubmittal items to architect. Reviewed for water supply and access only.
Routing - PLAN CHECK9/6/2006 9/21/2006 PEND
PLANS ROUTED TO FIRE FOR ACCESS & WATER REQUIREMENTS ONLY. Review for all building code requirements not completed at this time.
Routing - PLANNING9/5/2006 9/6/2006 FAIL
Failed both DR and CU. Letter to be issued. DRH05-00397 and CUP05-00015.
Routing - PLUMBING8/30/2006 9/5/2006 FAIL
plans are incomplete, please address the above listed items.
Routing - Erosion and Sediment8/29/2006 8/30/2006 PASS
ESC plan approved with attached conditions.
Routing - PUBLIC WORKS8/22/2006 8/29/2006 PASS
Routing Off Site - STRUCTURAL8/15/2006 8/28/2006 FAIL
8/15/06 - Called Action Courrier for pick up 8/15/06 @ 12:30pm BAS. Original submittal includes structural for concrete package only.
8/28 - Concrete package review received. Review failed.
Routing - Addressing8/24/2006 8/24/2006 PASS
Routing - PLANNING Land Div8/14/2006 8/22/2006 FAIL
Failed because parcels not combined
Plans ACCEPTED BY PLAN TECH  8/14/2006  
Application received  8/11/2006  
First Notice2/12/20202/12/2020   
DetailsJim Storey
BLD-Footing11/16/201811/19/2018 A 
DetailsDave Hannah
per Lee has nothing to do with plan mod in review // Lee Phone #: ###-####