Case Summary (BLD) | | | 9/21/2015 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 6/11/2014 | | DONE |
Christina Prado
|
|
|
|
Case Summary (BLD) | | | 5/30/2014 | | DONE |
Christina Prado
|
|
|
|
BLD-Conference | 9/4/2013 | 9/10/2013 | 9/16/2013 | A | FAIL |
Tony Young
|
|
|
Per 325,, status review
|
Expired/Cancelled | 9/13/2013 | 9/13/2013 | 9/13/2013 | | FAIL |
Bob Archibald
|
|
|
Project has been abandoned no required inspections have been received or performed since 6/15/2012. Permit is expired and owner of record is responsible for abatement or new permit.
|
BLD-Conference | 8/16/2013 | 9/4/2013 | 9/4/2013 | A | PEND |
Tony Young
|
|
|
Per 325,, status review
|
BLD-Conference | 8/16/2013 | 8/16/2013 | 8/16/2013 | P | FAIL |
Tony Young
|
|
|
Per 325,, status review,, placed a SWO,, to much time,, needs to see plan review,, also enginered material has been exposed to the weather for a long period of time
|
Routing Walk-In (BLD) | 6/6/2013 | 6/6/2013 | 6/6/2013 | A | PASS |
Perry Paine
|
|
|
ok to install beam adjacent to first flight of stairs at entry will add extra hallway open area to upper level. exist footings ok..carry bearing through to the foundation. 2-2x4 trimmers for 2-1.75x9.25 versa lam 2800fb 6-6-2013 pep
|
BLD-Footing | 6/14/2012 | 6/15/2012 | 6/15/2012 | A | PART |
Tony Young
|
|
|
Late morning -- Jerry Phone #: ###-####,, foundation and footing ok,, work in progress
|
Fees Due Hold | 6/6/2012 | 6/6/2012 | 6/14/2012 | | DONE |
Christina Prado
|
|
|
|
BLD-Conference | 6/6/2012 | 6/6/2012 | 6/6/2012 | A | FAIL |
Tom Arcoraci
|
|
|
please post a stop work POSTED
|
BLD-Foundation | 5/24/2012 | 5/29/2012 | 5/30/2012 | A | CANC |
Tony Young
|
|
|
Ron ###-####
|
BLD-Footing | 5/24/2012 | 5/25/2012 | 5/29/2012 | P | CANC |
Tony Young
|
|
|
Ron ###-####
|
BLD-Footing | 5/24/2012 | 5/24/2012 | 5/25/2012 | P | PART |
Tony Young
|
|
|
Ron
|
Telephone call | | | 5/25/2012 | | DONE |
|
|
|
see Rita check 1022
|
BLD-Foundation | 5/22/2012 | 5/22/2012 | 5/22/2012 | P | NR |
Tony Young
|
|
|
ron Phone #: ###-####
|
Issue PAID IN FULL permit | | | 5/11/2012 | | DONE |
Christina Prado
|
|
|
|
Routing Walk-In (BLD) | 5/2/2012 | 5/2/2012 | 5/2/2012 | P | PASS |
Perry Paine
|
|
|
Ok to issue a separate demo permit prior to the major construction. Bond set at $4000.00 also to be ESC permit and fee for demo permit added. Bond may be approved for release at the time the BLD permit fees are paid and permit issued. 5-2-2012 pep
|
Routing Walk-In (BLD) | 4/25/2012 | 4/25/2012 | 4/27/2012 | A | DONE |
Perry Paine
|
|
|
|
Routing - MECHANICAL | 4/27/2012 | | 4/27/2012 | | PASS |
Troy James
|
|
|
|
Case Summary (BLD) | | | 4/27/2012 | | |
|
|
|
|
Inspection Record Card- Bld | | | 4/27/2012 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/27/2012 | | |
|
|
|
|
Permit Ready to Issue | | | 4/27/2012 | | |
|
|
|
|
Telephone call | | | 4/27/2012 | | |
|
|
|
4-27-12 called permit ready and fee given Also need RP before issue ///dld
|
Routing Walk-In (Zoning) | 4/25/2012 | 4/25/2012 | 4/25/2012 | A | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 4/24/2012 | 4/24/2012 | 4/25/2012 | A | DONE |
Perry Paine
|
|
|
|
Routing - MECHANICAL | 4/25/2012 | | 4/25/2012 | | FAIL |
Troy James
|
|
|
emailed corrections to Ultimate
|
Plan assigned to (PEP) | | 4/17/2012 | 4/19/2012 | | FAIL |
Perry Paine
|
|
|
|
Routing - PLAN CHECK | | | 4/19/2012 | | PASS |
Perry Paine
|
|
|
need more information.
|
1st review completed | | | 4/19/2012 | | FAIL |
|
|
|
need larger plans, need plot plan with proper setbacks
|
Application received | | 4/17/2012 | 4/17/2012 | | DONE |
Christina Prado
|
|
|
|
Routing - PLANNING | 4/17/2012 | | | | |
Colleen T Carroll
|
|
|
On hold, Perry is reviewing first
|